Project
-
Client | Oktra
-
Duration | 6 weeks
-
Value | £80k
-
Electricians | 4
-
Completion Date | Aug 2021
Electrical Work
-
Led Lighting
-
Emergency lighting
-
Exterior lighting
-
PIR lighting
-
Fire alarm designs and installation
-
Access Control/ Door Entry
-
Power installation
-
Network cabling
-
Trucking and containment
-
Inspection and testing
![](https://static.wixstatic.com/media/5f1e79_1db0d348dbd94a99b3cb0d42a0f8199b~mv2.jpg/v1/fill/w_980,h_653,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/5f1e79_1db0d348dbd94a99b3cb0d42a0f8199b~mv2.jpg)
![](https://static.wixstatic.com/media/5f1e79_45aa4f4053844a9a9fdb5ed2c03c0922~mv2.jpg/v1/fill/w_980,h_653,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/5f1e79_45aa4f4053844a9a9fdb5ed2c03c0922~mv2.jpg)
![](https://static.wixstatic.com/media/5f1e79_c1c5a1635991405eb3526e086f5298d9~mv2.jpg/v1/fill/w_980,h_653,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/5f1e79_c1c5a1635991405eb3526e086f5298d9~mv2.jpg)
![](https://static.wixstatic.com/media/5f1e79_1db0d348dbd94a99b3cb0d42a0f8199b~mv2.jpg/v1/fill/w_980,h_653,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/5f1e79_1db0d348dbd94a99b3cb0d42a0f8199b~mv2.jpg)
1/12
bottom of page